FINISHING & EPOXY PROJECTS
Clean Room /
Pour Room.
Give your project a finish worth showing off. Book a quieter space to paint, stain, oil or pour epoxy, then arrange time for it to dry.

What will you finish?
Paint, stain or oil
Work away from workshop dust, with good light to see the finish and separate ventilation.
Pour epoxy
Use the level pouring bench for a small project, with carts and saw horses to help support your work.
Leave it to dry
Arrange affordable drying space in a heated room, so your project can stay put between coats or while it cures.
Small projects, not production spraying.
- Spray cans: allowed with approved products.
- HVLP: not permitted.
- Pump-style spraying: small quantities of water-based products only, not production work.
Before you use the room
Book ahead, get products approved and read their safety data sheets. Respirator and safety glasses are required. Follow posted ventilation, surface protection and cleanup instructions.
Complete the project label with products used, location, application, drying and move times. No volatile chemical use in the last hour before closing. Use the other entrance to avoid bringing workshop dust through the room.
Learn through a project.
These project classes use the room. They are not Clean Room orientation classes.
Want to look around first? Book a tour.

